installation
Water flow
Installation
In.clear unit must be installed
before the spa is filled with water.
The in.clear unit must be
installed on the pressure side
of the circulation pump (refer
to Fig.A for details). It should be
installed after the heater.
The in.clear system can be
installed in an upright position or
horizontally.
Installing valves on both sides
of the in.clear may help for
maintenance purposes
14
We do not recommend to
install the in.clear on a spa
equipped with a dual-speed
pump. The in.clear works
only when the pump is
running, therefore the dual
speed pump will require
to run around 8-10 hours
to have optimum bromine
production. Running a
large pump for that period
of time may be difficult in
warm weather, without
overheating the spa.
The in.clear system should
be installed at the pressure
side on a 11,4 to 151 liters/min
(3 to 40 US GPM) flow line.
It's important not to exceed
151 liters/min (40 US GPM) to
prevent excessive electrode
wear and damage to the
in.clear unit.
For all types of installation
make sure there's no pinches
in the plumbing and that
water flows.
Water flow must run from
bottom to top.
in.clear
If water flow is as low as
11.4 liters/min (3 GPM) and
in.clear is to be installed
horizontally, an air gap
may be appear at the top
which may decrease the
performance of the unit. In
that case, raise the outlet
about 1 inch above the
water inlet level. The exact
location and the method of
installation of the in.clear
may vary depending on the
plumbing design of the spa.

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Aeware in.clear 0605-500002

Table des Matières