Appendix A: Display Messages For Status And Timers - Eaton ATC-300 Mode D'emploi

Table des Matières

Publicité

APPENDIX A: DISPLAY MESSAGES
FOR STATUS AND TIMERS
Display Message
TDEC
TDES
TDNE
TDN
TDEN
TRANSFER
ATS NOT IN AUTOMATIC
LOCK-OUT OVERCURRENT TRIP
ENGINE RUN
START TEST?
WAIT FOR S2
TD PRE-TRAN
SYNC TIME
SOURCE 1 DEVICE
SOURCE 2 DEVICE
TDEF
TD UNBAL
TEST ABORTED
GO TO SOURCE 2
FAILSAFE
SETPOINTS ERROR
OPTIONS ERROR
PROGRAMMING SETPOINTS
WAITING FOR NEUTRAL
WAITING FOR S1 TO OPEN
WAITING FOR S2 TO OPEN
WAITING FOR S1 TO CLOSE
WAITING FOR S2 TO CLOSE
IB01602001T
ATC-300 Automatic
Transfer Switch
Controller
Countdown cool-off timing before the generator contacts are opened.
Countdown timing before the generator contacts are closed.
Countdown timing before Source 1 is disconnected before transferring to Source 2. Timing begins when Source
2 is available.
Countdown timing with both sources disconnected from the load.
Countdown timing before Source 2 is disconnected before transferring to Source 1. Timing begins when Source
1 becomes available.
Waiting for the switch to make the transfer from the neutral position to the intended source.
Control input for monitor mode is closed.
A trip condition has been detected by either breaker, and the system is locked-out from further transfers.
The engine run test timer is counting down before the test is completed. Pressing the Engine Test pushbutton
will abort this timer and the test.
To initiate an engine test sequence, press the Engine Test pushbutton again, or press Increase and Decrease
pushbuttons simultaneously to clear.
Waiting for the Source 2 source voltage and frequency to become available.
Countdown timer while waiting for a pre-transfer acknowledge input.
Countdown timing in minutes while waiting for sources to synchronize during an in phase transition.
Indicates that the Source 1 device (i.e. circuit breaker, contactor) failed to open or close
Indicates that the Source 2 device (i.e. circuit breaker, contactor) failed to open or close.
Countdown timing before declaring Source 2 unavailable (accounts for momentary generator fluctuations).
Countdown timer before declaring a source unavailable due to a voltage unbalance condition.
Indicates that an engine test or plant exercise was aborted after three unsuccessful attempts. Source 2 did not
remain available while TDNE was timing.
Indicates that the load is connected to Source 2 because the Go To Source 2 control input is in the "uncon-
nected" state.
Indicates that the load was connected to Source 2 but Source 2 became unavailable so the load transferred back
to Source 1.
Memory problem with the setpoints. Contact the factory.
Memory problem with the factory options. Contact the factory.
Setpoints are being saved in memory.
Waiting for the neutral position to be reached by the switch.
Waiting for the Source 1 device (i.e. circuit breaker, contactor) to open.
Waiting for the Source 2 device (i.e. circuit breaker, contactor) to open.
Waiting for the Source 1 device (i.e. circuit breaker, contactor) to close.
Waiting for the Source 2 device (i.e. circuit breaker, contactor) to close.
For more information visit: www.eatonelectrical.com
Instruction Booklet
Effective: January 2006
Page 25

Publicité

Table des Matières
loading

Table des Matières