Installation Instructions - Cardin Elettronica 200/BL202 Instructions

Automatisme pour portails battants
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION INSTRUCTIONS

Before starting the installation of the system check that the structure
which is to be automated is in good working order and respects
the local standards and regulations in force.
To this end make sure that the gate is suffi ciently rigid (if necessary
reinforce the structure) and that the runner guides slide easily.
You are advised to grease all the moving parts using lubricants
which maintain unaltered friction characteristics over a period of
time and are suitable for temperatures of -20 to +70°C.
• Check the safety measures between the fixed and moving
parts:
- a minimum space of 30mm must always be left along the entire
distance between the gate and the support column measured
throughout the entire opening angle of the gate.
- make sure that the space between the bottom of the gate
and the pavement never exceeds 30mm throughout the entire
opening angle of the gate.
• The surface of the gate must not feature openings which allow
a person's hand or foot to pass through.
• Check the exact positioning of the pivots, and their good work-
ing order (the upper and lower hinges/pivots must be aligned
on the same axis).
ATTENTION! A mechanical stop buffer must be installed
in both the opening and closing positions ( position 1,2,3
fi g.11).
• Work out the run of the cables according to the command and
control devices fi tted and make sure the system conforms to the
local standard and regulations in force (see installation example
fi g.1 pag. 2).
• Check that the appliance is suitable for the size, weight and duty
cycle of the gate to which it is to be applied (see duty cycle on
page 28)
FITTING THE UNITS 200/BL202- BL202L
The unit may be positioned either to the right or to the left of the
passageway. To install the unit correctly carry out the following
procedure carefully.
• Move the gate/s to the closed position.
• Select the type of opening required (fi g.8,9 pag.5).
• Fasten the rear mooring bracket to the column (fig.13 pag.7),
taking into account the measurements "A" and "B", after
having checked the position of the gate hinge with respect to
the column (measurement "C" fig. 8,9 page 5) according to the
type of opening required.
• Fix the arm to the rear mooring bracket "5" using the retaining
pin "1" (fig.2 pag.3) and the front bracket "6" using the pin
"7".
• Extend the arm manually until it reaches 5mm from the end of
the travel distance.
ATTENTION! The centre distance between the front moor-
ing bracket "2" and the rear mooring bracket "1" must never
exceed 1000 mm for the BL202and 1345mm for the BL202L
(see fi gures 8-9 on page 5)
• Move the arm to its normal operating position, rest the head
against the gate and mark the position of the front bracket
"6".
Note: Make sure the operator is perfectly level (using a spirit
level) and then fi x the front bracket to the gate (fi g.14 pag.7).
• The front bracket may be fi xed in the following positions:
- on the gate frame or on a horizontal cross beam,
- if this is not possible, fi x a reinforcing plate to the gate structure
and then fasten the front bracket onto the reinforcing plate.
• Insert the arm in the front bracket "6", insert the retaining pin
"7" and fasten down using the supplied C-clips (fi g.2 pag.3).
• Install the protective carter by fastening the 4 screws on the
geared motor (pos.2 fig.2) and position the plastic protective
cap (pos.4 fi g.2).
• With the motor released move it manually to the fully open posi-
tion and check that all the components work correctly.
• If you are using 200/BL202L with a gate from 2 to 4 metres in
width an electric locking device must be fitted to ensure that
the gate is blocked when it is closed.
FITTING THE UNITS 200/BL352 - 200/BL452
The unit may be positioned either to the right or to the left of the
passageway. To install the unit correctly carry out the following
procedure carefully.
• Move the gate/s to the closed position.
• Select the type of opening required (fi g.8 pag.5).
• Fasten the rear mooring bracket to the column (fig.13 pag.7),
taking into account the measurements "A" and "B", after having
checked the position of the gate hinge with respect to the column
(measurement "C" fi g. 8 page 5) according to the type of opening
required.
ATTENTION! The motor must be installed on the
gate with the humidity drain holes "A" facing
downwards (see drawing)
• Fix the arm to the rear mooring bracket "5" using the retaining pin
"1" (fi g.2 pag.3) and the front bracket "6" using the pin "7".
• Extend the arm manually until it reaches 5mm from the end of
the travel distance.
ATTENTION! The centre distance between the front moor-
ing bracket "2" and the rear mooring bracket "1" must never
exceed 1020 mm for the BL352 and BL452 (see fi gure 8 on
page 5)
• Move the arm to its normal operating position, rest the head
against the gate and mark the position of the front bracket
"6".
Note: Make sure the operator is perfectly level (using a spirit
level) and then fi x the front bracket to the gate (fi g.14 pag.7).
• The front bracket may be fi xed in the following positions:
- on the gate frame or on a horizontal cross beam;
- if this is not possible, fi x a reinforcing plate to the gate structure
and then fasten the front bracket onto the reinforcing plate.
• Insert the arm in the front bracket "6", insert the retaining pin
"7" and fasten down using the supplied C-clips (fi g.2 pag.3).
• Install the protective carter by fastening the 4 screws on the
geared motor (pos.2 fig.2) and position the plastic protective
cap (pos.4 fi g.2).
• Extend the arm manually until it reaches 5mm from the end of
the travel distance.
• Mount the electric locking device (locks the gate in the closed
position).
FITTING THE UNIT 200/BL202C
The unit may be positioned either to the right or to the left of the
passageway.
To install the unit correctly carry out the following procedure
carefully.
• Move the gate/s to the closed position.
• Select the type of opening required (fi g.10 pag.5).
• Fasten the rear mooring bracket to the column (fig.13 pag.7),
taking into account the measurements "A" and "B", after
having checked the position of the gate hinge with respect to
the column (measurement "C" fig. 10 page 5) according to the
type of opening required.
• Position the protective carter "3" (with the scoring facing the
16
A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

200/bl202l200/bl202c200/bl352200/bl452

Table des Matières