Valve Train Replacement - Napoleon Oakville Serie Manuel D'installation

Masquer les pouces Voir aussi pour Oakville Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.9

valve train replacement

A.
Remove the safety barrier and glass door (see "safety barrier and door removal/installation" section).
B.
Remove the burners (see "burner removal" section).
C.
Remove the 14 screws holding the valve train in place (Fig. 6-2).
note:
A new gasket may be required when reinstalling the valve train assembly. Contact your local authorized
dealer / distributor for more information.
D.
Carefully lift the valve train assembly out far enough to access the manual shut off valve and turn to the
off position. Disconnect the fl ex connector from the valve. You may now lift the valve train out of the
appliance.
maintenance
Fig. 6-2
29
W415-2828 / A / 07.13.20
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Oakville gdix4nOakville gdix4p

Table des Matières