Instructions For The Installer; Terminal Block - Zanussi ZOB 461 Importantes Informations Pour L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

28 electrolux

Instructions for the Installer

Installation and connection must be
done in compliance with the
regulations in force. Any interventions
must be carried out when the
appliance is switched off. Only
accredited engineers may work on the
appliance.
The manufacturer disclaims any liability if
the safety measures are not observed.
Connecting to the electrical supply
Before connecting to the electrical supply,
please make sure:
-
The fuse and the domestic electrical installa-
tion must be designed for the max. load of the
appliance (see rating plate).
-
The domestic electrical installation must be
equipped with a proper earth connection in
accordance with the regulations in force.
-
The socket or the multi-pole off switch must be
easy to access after the appliance has been
installed.
This appliance is delivered with an electric
supply cable.
A proper plug, according to the electric load
specified on the rating plate, must be fitted to the
cable. The plug is to be inserted into a suitable wall
socket. If you require a direct connection to the
electric network (mains), it will be necessary to fit
between the appliance and the mains an omnipole
switch, with a minimum gap between contacts of 3
mm, suitable for the required load and in
compliance with rules in force. The green & yellow
ground wire must not be interrupted by the switch
and it should be 2-3 cm. longer than the other
cables.
The mains cable and plug as supplied are to
be connected to a shockproof socket (230 V~, 50
Hz). The shockproof socket must be installed in
accordance with the regulations.
The following types of mains cable are
suitable, taking the necessary rated cross section
into account: H07 RN-F, H05 RN-F, H05 RR-F,
H05 VV-F, H05 V2V2-F (T90), H05 BB-F.
The connection cable must in any case be laid
out so that at no point does it reach 50°C (over
room temperature).
28
After the connection has been carried out, the
heating elements must be tested by being
operated for about 3 minutes.

Terminal block

The oven is fitted with an easily accessible
terminal block which is designed to operate with a
single-phase power supply of 230 V.
Letter L
-
Letter N
-
or E
-
Live terminal
Neutral terminal
Earth terminal

Publicité

Chapitres

Table des Matières
loading

Table des Matières