Checking The Installation Site - Mitsubishi Electric CITY MULTI CMB-P-V-E Serie Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50
<Front view> (when hanging to install)
B
*1 Dimensions with which pipe connection can be handled at site
Model name
A
CMB-P104V-E
702
CMB-P105V-E
702
CMB-P106V-E
702
CMB-P108V-E
702
CMB-P1010V-E
702
CMB-P1013V-E
1152
CMB-P1016V-E
1152
2. When stacking on a rack
(This is a reference view showing the least installation space.)
B
A
B
A
150
298
85
533
Model name
A
CMB-P104V-E
702
CMB-P105V-E
702
CMB-P106V-E
702
CMB-P108V-E
702
CMB-P1010V-E
702
CMB-P1013V-E
1152
CMB-P1016V-E
1152
A On the side of outdoor unit piping
B On the side of indoor unit piping
6
50
A
50

2.3. Checking the installation site

Check that the difference of elevation between indoor and outdoor units
and the length of refrigerant piping are within the following limitations.
A
I
A
H
a
C
b
D
A Outdoor unit
B BC controller
C Indoor unit
D More than 81
E Less than H=50mm (when the outdoor unit is higher than the indoor unit)
F Less than H=40mm (when the outdoor unit is lower than the indoor unit)
G Branch pipe (for Y Series) CMY-Y-102S-F
H Combined pipe (optional)
I Less than 70 (60m)
J Less than 30m
K Up to three units for 1 branch hole
Total capacity: less than 80 (but same in cooling/heating mode)
L Less than h1=15m (10m or less for 125 unit type)
M Less than h2=15m
Notes:
*1 In the table, if the total capacity of indoor units exceeds 130% of
outdoor units, it will be the values inside parentheses.
*2 10m or less, with indoor units with model numbers of 125.
B
J
G
B
c
d
e
C
C
C
K
C

Publicité

Table des Matières
loading

Table des Matières