Weekly Maintenance; Baffle Removal; Clean-Out Covers; Monthly Maintenance - England's Stove Works 25-CB120 Manuel D'installation

Masquer les pouces Voir aussi pour 25-CB120:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Baffle Removal  
 As with any maintenance concerning this unit, be sure the unit is "OFF," has completed 
the Shut‐Down cycle, and is completely cool BEFORE beginning.  Be aware that metal 
parts in the firebox can remain HOT long after the fire has gone out and EVEN after the 
Shut‐Down cycle is complete.  Always use extreme caution when handling potentially 
hot stove parts, even if you think they should be cold. 
 Weekly maintenance should include the steps listed in this section AS WELL AS the steps 
listed in the "Daily Maintenance" section. 
 Remove the top baffle (inside the firebox, above the door) by lifting it up and pulling it 
forward, then tilting it sideways to remove it from the stove.  The part number for the 
top baffle is AC‐CBTB. 
 Remove any ash that has accumulated behind the baffle in the stove. 
 The use of a utility vacuum is highly recommended because it will prevent fly‐ash from 
falling through the exhaust holes and into the exhaust chamber. 
 Replace the baffle by reversing the above steps. Be sure the tabs in the baffle fit into the 
matching holes in the firebox wall of the stove. The top of the baffle will rest against the 
front wall of the stove when it is properly installed. 
Clean‐Out Covers 
 Remove the exhaust chamber clean‐out port covers (lower left and right, on either side 
of the burn pot).  Use a 5/16" socket wrench to loosen the screw on each cover, then 
pull the cover upwards to remove it from the screw. 
 BEFORE vacuuming the chamber out, observe the type and quantity of ash build‐up.  
The ash deposited in the exhaust chamber should be light, fluffy, grey or white in color, 
and should be no higher than half way up the clean‐out port. 
Using a utility type vacuum cleaner, vacuum the fly ash out of the exhaust chamber.  A 
short piece of hose can be attached to the end of the utility vacuum line and can be 
useful in reaching the ash. Replace the clean‐out port covers when finished. 
 A specially designed ash vacuum and pellet stove cleaning kit is available from the 
England's Stove Works website; please see: store.heatredefined.com . 
 
 NOTE:  As with any maintenance concerning this unit, be sure the unit is "OFF," has 
completed the Shut‐Down cycle, and is completely cool BEFORE beginning. 
IMPORTANT!  READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING THE UNIT AS SPECIFIED, AND 
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR DUE TO UNSAFE INSTALLATION OR 
 
 
WEEKLY MAINTENANCE 
MONTHLY MAINTENANCE 
REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED. 
USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS. 
 
32 
 

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

55-shpcb12055-trpcb120

Table des Matières