Installation - Watts Big Bubba Manuel D'installation, D'utilisation Et D'entretien

Une solution complète de système pour toute la maison pour la réduction du plomb, des pfoa/pfos (substances perfluoroalkylées), des kystes, et du goût et de l'odeur de chlore
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Note: Locate the components identified in previous "Preparing
the System for Installation" Step 2 for use in this section.
See Installation Diagrams on page 12 for additional
information.
Step 1 -
The system must be installed in a vertical position.
Place the system in the desired location. Make sure that the
mounting surface is level and sturdy enough to support the
weight of the system while in operation.
Step 2 -
Prepare the filter housing for installation by first
unthreading and removing the union nuts of both the inlet and
outlet ports in a counterclockwise motion. Install the plumbing
adaptor O-ring into the O-ring grove of each inlet and outlet port,
attach plumbing adaptors and reattach union nuts tightening
hand tight only, DO NOT use wrenches. DO NOT use thread
sealant of any kind on the union threads. Use only silicone lubri-
cant on O-rings.
Note: System has an optional outlet port to accommodate dif-
ferent plumbing arrangements. Outlet plumbing adaptor can be
relocated to optional outlet port if desired.
Step 3 -
Using a primer and glue system approved for pres-
surized PVC potable water plumbing applications, install the 2"
Male Glue X 1" FNPT PVC plumbing bushings into the inlet and
outlet plumbing adaptors.
IOM-WQ-BB-S100
2130
A
DETAIL B
EDP# 68110146
Step 4 -
Apply plumbing tape to the inlet thread of the 1"
inline flow meter. An arrow on the flow meter indicates the direc-
tion of flow. Apply plumbing tape to the outlet thread of 1" flow
meter if required by the outlet plumbing method used. Insert flow
meter into system outlet plumbing port with the arrow pointing in
the direction of flow. Hand tighten only, clockwise, DO NOT use
wrenches.
Step 5 -
Insert 2 AA alkaline batteries into flow monitor.
Monitor will turn ON once batteries are installed.
Step 6 -
Apply double sided tape to flow monitor mounting
bracket. Press hold bracket against desired mounting location for
10 seconds. Mounting surface must be clean and dry. Insert flow
monitor into mounting bracket.
DO NOT INSTALL
ANY HARDWARE ON
BRACKET TO AVOID ANY
DAMAGE TO SYSTEM
(WARRANTY VOIDED IF
HARDWARE IS PRESENT)
INSTALL AS SHOWN
& APPLY PLUMBING TAPE
TO PREVENT LEAKS
9
© 2021 Watts

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bb-s100

Table des Matières