Napoleon Acies Série Manuel D'installation page 44

Masquer les pouces Voir aussi pour Acies Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

finish framing - after appliance installation
EN
see-thru double built out
note:
Shaded components (finish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its final position and venting
connected.
Drywall
minimum framing
Ref
N* / **
* Finishing material must be considered with the protrusion (i.e. P includes framing and
finish material). If desired, side and bottom protrusions can be installed with 4" (10.1cm)
Max.
** This is a recommended dimension when mounting electronics above the appliance.
Otherwise, it can be as minimal as construction permits.
44
W415-1707 / 07.04.17
N*
O*
Insulation
L38
E
16 3/16" (41.1cm)
14 1/4" (36.2m)
O*
25 11/16 (65.2cm)
4" (10.1cm) Max
P*
Ceiling
E
L50
16 3/16" (41.1cm)
14 1/4" (36.2m)
25 11/16 (65.2cm)
4" (10.1cm) Max
P*

Publicité

Chapitres

Table des Matières
loading

Table des Matières