Napoleon Acies Série Manuel D'installation page 43

Masquer les pouces Voir aussi pour Acies Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

see-thru flush
note:
Shaded components (finish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its final position and venting
connected.
Drywall
minimum framing
Ref
K
E
F
J
L
finish framing - after appliance installation
Insulation
L38
39 15/16" (101.4cm)
16 3/16" (41.1cm)
53 13/16" (136.7cm)
Optional - Appliance does not need to be elevated above floor
74" (188cm)
Ceiling
K
E
F
L50
39 15/16" (101.4cm)
16 3/16" (41.1cm)
65 13/16" (167.2cm)
74" (188cm)
EN
L
J
43
W415-1707 / 07.04.17

Publicité

Chapitres

Table des Matières
loading

Table des Matières