Test Run Narrative; Run 1; Test Conditions Summary; Appliance Operation And Test Settings - PFS 5520 Mode D'emploi

Table des Matières

Publicité

Test Run Narrative

Run 1

Run 1 was performed on 8/29/2019 as an attempted integrated test run per ASTM E2779.
The overall test duration was 360 minutes. The particulate emissions rate for the
integrated test run was 1.46 g/hr. The run had an overall HHV efficiency of 68.1%. The
train A front filter was changed at 1 hr. All test results were appropriate and valid and the
burn rate requirement for the integrated test run were achieved. There were no anomalies
and all criteria were met.

Test Conditions Summary

Testing conditions for all runs fell within allowable specifications of ASTM E2779 and
ASTM E2515. A summary of facility conditions, fuel burned, and run times is listed below.
Ambient (°F)
Runs
Pre
Post
1
79
77

Appliance Operation and Test Settings

The appliance was operated according to procedures as described in the Operations
Manual, found in Appendix B submitted with this report. Detailed run information can be
found in Appendix A submitted with this report.
Settings & Run Notes
Run 1
Heat Setting #4
Page | 8
Average
Relative
Barometric
Humidity (%)
Pressure
(In. Hg.)
Pre
Post
26
30
29.99
Pre-Burn
High Segment: Heat Setting #4
Medium Segment: Heat Setting #1
Low Segment: Heat Setting #1
Project # 19-511
Preburn
Test Fuel
Test Fuel
Fuel
Weight
Moisture
Weight
(lbs)
(lbs)
8.0
14.7
Test Run
Model: 5520
Test Run
Time
(%DB)
(Min)
2.54
360

Publicité

Table des Matières
loading

Table des Matières