GE ARC13AACWK1 Manuel D'utilisation page 11

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
F. ELECTRICAL CONTROL INST.
1. From inside the RV, double check the gasket's
position and alignment above the roof opening.
Adjust if necessary. The air conditioner can be
moved and adjusted by pushing upwards from
inside the RV.
2. Reach through the base pan and pull the electrical
power cord from the air conditioner through the
ceiling opening.
3. Push the ceiling mounting template into the roof
opening and begin hand-threading each of the 4
mounting bolts through the nuts in the base pan.
4. Tighten the 4 bolts evenly to 45±5 inch pounds
using a torque at least rated for 0-60 in-lbs. Even
compression is required to prevent leaks through
the gasket.
5. Place dividing baffle into position on the ceiling
assembly. Ensure baffle is pressed against the
base pan, forming an airtight seal.
6. Mount the dividing baffle to the mounting template
using three screws.
7. Mount the dividing baffle to the framing timber
using two screws, creating an airtight seal.
8. Mount main control box to the mounting template
using four screws.
9. Remove two screws from main control box,
allowing the bottom section to hinge open. Control
board is now visible and accessible.
10. Route the 115 VAC power cord through the strain
relief of the control box. Tighten the strain relief,
making sure not to damage the wires.
to black, white to white, and ground to green.
prevent any potential movement due to vehicle
vibration.
13. Route the 6 pin connector through opening of
the strain relief of the control box. Mate 6 pin
connector to the control box's wire harness.
wires (blue), 3 thermostat wires (red, yellow,
black), and two 12 VDC battery wires (red and
black).
49-5000406 Rev. 0
F. ELECTRICAL CONTROL INST.
15. Rotate lower section of control box upwards,
making sure not to crush any wires. Drive two
screws, securing the control box closed.
16. Grasp indoor coil temperature sensor, which is
hanging out of the control box. Reach up through
the mounting template and base pan to install the
sensor into the evaporator coil thermistor well (see
figure below).
17. Align plastic ceiling panel to the metal assembly.
18. Install the 6 provided sheet metal screws to attach
the plastic panel to the metal assembly. The
filter and screw covers must be removed to install
these screws.
19. Assemble the filter and screw covers to the plastic
panel.
20. Installation is complete. Refer to thermostat
operating instructions before attempting to
operate.
Thermistor Well
(cont.)
11

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Arc13aacbk1Arc15aacwk1Arc15aacbk1Arh15aacwk1Arh15aacbk1

Table des Matières