Loading The Cartridge Kit - TECHCON SYSTEMS TS6500CIM Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.6

Loading the Cartridge Kit

Note: The unit is setup to mix cartridge kit with 8'' (203mm) mix rod. To
mix cartridge kit with 6'' (152mm) mix rod, the spindle extension needs to
be installed. Refer to section 8.3 for instructions.
1.
Open the safety cover (Fig. 2.0, 12).
2.
Load the cartridge kit into the cartridge holder (Fig. 2.0, 2).
3.
Pull the mix rod to the fullest extend then align the two through holes of the
rod to the drive spindle (Fig. 2.0, 6).
4.
Turn the cartridge kit lightly in clockwise direction to lock it to the spindle.
5.
Insert the plunger assembly (Fig. 2.0,16) into the cartridge holder with the
plunger correctly seated inside the cartridge.
6.
Align the dowel pins of the plunger assembly with the bayonet slots in the
cartridge holder and turn counterclockwise until it locked in.
7.
Connect the air hose into the plunger air inlet (Fig. 2.0, 4).
8.
Close the safety cover.
LOCKING DOWEL
PINS
MIX ROD
Figure 12.0 Loading the Cartridge Kit
15
PLUNGER
ASSEMBLY
PLUNGER
AIR INLET
CARTRIDGE
HOLDER
DRIVE
SPINDLE

Publicité

Table des Matières
loading

Table des Matières