Wall Track Installation - OVE ARUBA Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Level the tracks (B & B1) and mark the track holes' positions.
2. Remove tracks and drill pilot holes in the marked locations with a ø5/16" (8mm) drill bit.
3. Insert the wall anchors (DD) using a rubber mallet until the wall anchors are flush with the wall.
4. Replace and secure the tracks (B & B1) with screws (BB). Do not overtighten.

WALL TRACK INSTALLATION

Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
1 7/16"
57 5/8"
37mm
1464mm
Helpful Hint
Do not overtighten!
This may crack the
acrylic or tile walls.
9
1
B
B1
2
ø5/16"
8mm
3
DD
4
&
B
B1
BB

Publicité

Table des Matières
loading

Table des Matières