System Diagram - Noritz NC250-SV-ASME Manuel D'installation

Masquer les pouces Voir aussi pour NC250-SV-ASME:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.
Quick Connect Multi System Installation
• The Quick Connect Multi System allows the installation of two units together utilizing only the Quick
Connect Cord.
The Quick Connect Cord is 2m (6'). long. Install the units 150 - 482mm (6-19") apart from each
other to ensure the cord will be able to reach between the units. (See Typical Plumbing diagram).
(If the distance between the two units is too great, not only will the cord not be able to reach,
but the water temperature may also become unstable because of the difference in pipe length
between the two units).

System Diagram

Quick Connect
Cord
Cord
Connector
Typical Plumbing
Make this distance as short as possible.
* The hot water temperature will
become unstable as the pipe
length increases.
• Insulate the hot water piping to prevent heat loss. Insulate and apply heating materials to the cold
water supply piping to prevent heat loss and freezing of pipes when exposed to excessively cold
temperatures.
Cord
Connector
Terminal Block
Remote Controller Cord
Union
Quick Connect
cord
Pressure
Relief
Valve
Shutoff
Valve
Leave enough clearance around the plumbing to
apply insulation. It will be necessary to add
bends to the piping to ensure that this clearance
is available.
* When connecting two units, use only
a single remote controller.
Note: Connect the remote
Remote Controller
Gas Supply Piping
G
Cold Water Supply
Hot Water
Distance at center
618 - 950mm (24.3-37.4")
Distance on sides
150 - 482mm (6-19")
Union
Union
Gas Valve
Shutoff Valve
Size the piping to allow for the maximum
flow rates of the units.
controller to only one
of the units.
Shutoff
Valve
Hot Water
Cold Water
3

Publicité

Table des Matières
loading