Assembly Order And Preparation For Operation - Agu PMBF2 Mode D'emploi

Machine à biberons
Masquer les pouces Voir aussi pour PMBF2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY ORDER AND PREPARATION FOR OPERATION

1. Install the gasket as shown in the pic. 1, item 5.
2. Install the container for the formula (pic. 1, item 3) in such a way that
the container ledge coincides with the groove (slot) on the main unit, as
shown on picture 1, item 2 (2.1–2.6). Ensure that the container is firmly
inserted in the block, and the teeth of the container shaft and the main
unit do not hit each other (are in bond). If necessary, rotate the container
shaft manually and reinsert the container.
Picture 1.
55
EN

Publicité

Table des Matières
loading

Table des Matières