Table des Matières

Publicité

Connect the cables

1. Loosen the four lid screws (T20) and remove the lid.
1
Input power connector
2
I/O connector
3
RJ45 connector
4
SFP slot for SFP module (SFP module not included)
2. Connect the network (optical fibre and/or RJ45), I/O and power cables. For more
information on different network connectivity options, see Install the network link on
page 28.
3. Return the lid to its position and tighten the four lid screws (torque 3.0 Nm).
AXIS Q8685-E PTZ Network Camera
29
EN

Publicité

Table des Matières
loading

Table des Matières