Luminance Brands kathy ireland HOME PREMIUM SELECT ECO CF4802AP00 Mode D'emploi page 19

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. Wall Control Installation
WARNING
!
Turning off wall switch is not sufficient. To avoid
possible electrical shock, be sure electricity is turned
off at the main fuse or circuit breaker box before
wiring. All wiring must be in accordance with National
and Local codes and the ceiling fan must be properly
grounded as a precaution against possible electrical
shock.
CAUTION
!
To reduce the risk of electrical shock, disconnect the
electrical supply circuit before installing the fan, light
kit or receiver.
7.5
NOTE: Electric connections should be in
accordance with the National Electrical Codes and
all Local Codes. Before starting, disconnect power
to the circuit at the fuse box or circuit breaker
panel.
Remove the Faceplate and Screws from the Existing
Wall Switch . Pull Switch out from Wall Box (Figure 32) .
Determine the "HOT" Wire and the "LOAD" Wire and
disconnect these Wires from Existing Wall Switch .
NOTE: Do not attempt to disconnect any Wires not
already connected to the Existing Wall Switch.
(Continued)
NOTE: Make all wiring connections using
Wire Connectors (supplied). Make sure that all
connections are tight, including ground, and that no
bare wire is visible at the wire connectors, except
for the ground wire.
7.4
Disconnect Electrical Power to the Branch Circuit at the
Circuit Breaker or Fuse Box before attempting to install
the Ceiling Fan Wall Control into the Wall Box .
SCREWS
Figure 32
19
WALL
SWITCH
FACEPLATE
luminancebrands.com
Please contact 1-800-777-4440 for further assistance
U.L. Model No.: CF4802 and CF4502
WALL
BOX

Publicité

Table des Matières
loading

Table des Matières