Connections; Hydraulic Connection - Eurovent MSW 3 Notice D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
3.3 - HOOKING OF THE INTERNAL UNIT
F
A - Remove the foam packing-pieces in
the baffle.
GB
B - Remove the unit's cover and connect
hoses, as required (Accessory item.
See corresponding installation
I
documentation).
C - Hook the air handler on the support
E
plate according to the opposite sketch.
Connect the water pipes (see
D
paragraph 4).
Run in any electric cables (see
paragraph 4).
D - Then, press on the bottom of the unit in
order to engage the bottom hooks in
the holes in the support plate.
E - In order to unhook the unit from the
support plate, push the unit upwards
and pull it towards you. The hooks are
then released from the support plate.

4 - CONNECTIONS

4.1 - HYDRAULIC CONNECTION

4.1.1 - GENERAL
• Connection type : 1/2" G male.
• Connection of exchanger outlet
connections inside the device.
• Remove the air treatment cover to
gain access.
4.1.2 - INSTALLATION
• 5
possibilities
orientation:
- For orientations 1 and 3 , cut
the plate (in order to put the
pipes through leaving the
contour
roughness).
- Keep the piece of plate cut for
possible later use.
• Before mounting the device on the
plate, connect the insulated
connections (not supplied) and the
condensate outlet tube.
• Install them, if necessary, in the
housing provided for this purpose.
Leave the installation flush along
the front.
• To aid assembly (and possible disassembly of the device), and to avoid transmitting vibrations, we recommend using flexible
tubes.
• Sets of 2 flexible tubes with their
connections and insulation are
proposed on option.
• For tube outlet orientations 1 and
2 (left side), it is necessary to use
longer flexible tubes.
4
A
C
tube
outlet
1
free
from
any
Insulation on connections
Clamp
K 60 L 060 Z
K 60 L 059 Z
Hooking
2
Length
Code
MSW 3
(mm)
550
1 250
B
D
E
Unhooking
5
4
3
Cover
Electrical cables
Insulating sleeve
(if applicable)
Pipes
Connections
air handler side
installation side
1/2" G female
1/2" G female
Water inlet
connection
Water outlet
connection
Condensate
pipe
1/2" G male
1/2" G male

Publicité

Table des Matières
loading

Table des Matières