Mitsubishi Electric PEH-P8MYA Manuel D'installation page 2

Table des Matières

Publicité

2
[Fig. 2.0.1]
3
[Fig. 3.2.1]
* In case of PEH-P8, 10MYA
A
B
20
400
A
1 When connecting air inlet
2 When installing the suspension fixtures prior to installation of the
indoor unit without inlet duct
3 When hanging the indoor unit directly without inlet duct
A Service space
C Air inlet
[Fig. 3.2.2]
* In case of PEH-P8, 10MYA
PEH-P10: 1580
PEH-P8: 1380
PEH-P10: 1480
B
PEH-P8: 1280
C
F
E
G
H
I
D
4
[Fig. 4.1.1]
A
B
A Ceiling board
B Edge beam
C Tie beam
D Square timber for hanging the air conditioner
E Pitch
2
B
C
PEH-P10: 1440
D
PEH-P8: 1240
20
PEH-P10: 1480
B
PEH-P8: 1280
200
PEH-P10: 2080 PEH-P8: 1880
1
2
3
B Suspension bolt pitch
D Air outlet
20
E Top of the unit
F 4-ø12 suspension bolt holes
G Control box
B
H Drain pan
I Main body
E
E
C
D
A
B
A Air outlet
B Remote controller
3.2
* In case of PEH-P16, 20MYA
B
*1
*1 When there is not 500mm of service space on top of the unit, there must be 700mm
of service space at the air outlet side.
* In case of PEH-P16, 20MYA
F
G
4.1
[Fig. 4.1.2]
F
F Insert: 100 to 150 kg (1 piece) (field supply)
G M10 hanging bolt (field supply)
H Reinforcement
PEH-P20:1940
B
PEH-P16:1637
C
A
D
400
200
PEH-P20:1890
PEH-P16:1587
PEH-P20:2490
PEH-P16:2187
A
PEH-P20:2043
PEH-P16:1740
PEH-P20:1940
B
PEH-P16:1637
C
E
I
H
G
1
2
3
25
B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Peh-p10myaPeh-p16myaPeh-p20mya

Table des Matières