Filling The Pump; Checks Before Initional Operation; Switching On And Off; Cleaning/Maintenance - FLORABEST FGPS 1100 B2 Mode D'emploi

Masquer les pouces Voir aussi pour FGPS 1100 B2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
(14). Both piecese marked with
a
B
3. Attach the adapter (11) to the
water inlet (2) . Both pieces
marked with an
4.
Attach the suction hose connec-
tion water inlet (13) with the seal
ring (12) to the adaptor (11).
Both pieces marked with an
Fit the water inlet free from air.
5.
Fit a pressure hose to the water
outlet (4) Fit the water outlet free
from air.
Air in the suction hose will stop the
garden pump from working prop-
erly.

Filling the pump

Fill up the garden pump every time before
you start using it. This will ensure an im-
mediate start. Running dry will destroy the
pump.
1. Open the filling screw (
garden pump.
2. Fill with water to the fill point and
retighten the filling screw (
Checks before initional
operation
Check that the electrical connec-
tion is 230V ~50Hz
Check the proper status of the
electrical plug socket and make
sure that the plug socket is suf-
ficiently fused (at least 10 A).
Make sure that moisture or water
never come in contact with the
mains connection.
There is a risk of electrocution.
IB_270726_FGPS1100B2_CB3_FI_SE_BE_ts.indb 9
.
.
A
9) on the
9).
Control the suction hose. The
end of the suction hose must be
placed in water.
Control the suction hose. The
end of the suction hose must be
in outlet position.
The device is not suitable to be con-
.
nected to a drinking water supply
A
system.

Switching ON and OFF

1. Connect the power cable (
power supply.
2. Switching On:
On/Off Switch (
After a suction period the pump begins
the supply of water.
3. Switching Off:
On/Off Switch (
Overload protection:
event of overload the equipment au-
tomatically switches off. To restart,
allow the equipment to cool then
switch it back on.

Cleaning/Maintenance

Clean and maintain your equipment regu-
larly. This will guarantee its performance
and long durability.
Ask our service centre to carry out
any work that is not described in
these instructions. Use only original
parts.
Pull out the power plug before
every maintenance operation. There
is a risk of electrocution or of injury
from moving parts.
GB
CH
6) to the
5) In position "I"
5) In position "0"
In the
9
30.09.15 10:39

Publicité

Table des Matières
loading

Table des Matières