Completing The Installation - Stiebel Eltron DHC 3 Utilisation Et Installation

Petit chauffe-eau instantané à commande hydraulique
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
INSTALLATION
Installation
Power supply from above on finished walls
f Cut an opening in the cable grommet suitable for the select-
f
ed power cable (for positions of the connections, see chapter
"Specification").
f Install the cable grommet in the back panel.
f
f Route the power cable through the appliance back panel.
f
Power supply from below on finished walls
f Push down the locking hook that secures the mains terminal,
f
then remove the mains terminal.
f Reposition the mains terminal in the appliance from the top
f
to the bottom and secure the mains terminal by sliding it
under the locking hook.
Note
The control wires must not impair the differential pres-
sure switch.
f Route the control wires on the side between the
f
differential pressure switch and the appliance back
panel.
f Cut an opening in the cable grommet suitable for the select-
f
ed power cable.
f Install the cable grommet in the back panel.
f
f Route the power cable through the appliance back panel.
f
Water installation for finished walls
DHC 3, DHC 4,
DHC 6, DHC 8
f Cut or break out the required entries in the appliance back
f
panel cleanly. If necessary, use a file.
22
| DHC
DHC 3, DHC 4,
DHC 6, DHC 8
DHC 3, DHC 4,
DHC 6, DHC 8
f Guide the connectors through the openings in the appliance
f
back panel and fit them with flat gaskets onto the appliance
connection pipes.
f Fit the tap connection pipes with flat gaskets onto the
f
connectors.

10.2 Completing the installation

f Fit the appliance cover.
f
f Secure the appliance cover with the screw.
f
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhc 4Dhc 6Dhc 8Dhc 6 u073478073715 ... Afficher tout

Table des Matières