Vasco EnergyPlus ENY–P1 Manuel D'installation, Utilisation Et Entretien page 147

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Electronic control board – Connections
Configuration DIP switches
The electronic board is equipped with a set of 10 Dip switches for configuring the unit, i.e. the
direction of use of the fans, and any accessories to be connected, such as pre- or post-air
treatment coils.
The dip switches configuration must be executed once the unit has been disconnected from
the power supply.
DIP
1
Installation of F1 intake to left
2
3
4
5
6
as remote general alarm status
7
OFF
Without preheating
PWM electric resistance
No post treatment
If 4 ON post heating only
FC contact usable
NA
DEFAULT
Installation of F2 intake to right
Valve actuator/E.R. ON/OFF
With post treatment
If 4 ON post-heating/cooling
FC contact to use as ON/OFF
potential free contact for Crystall Filter
147
ON
Preheating
English

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Energyplus eny–p2Energyplus eny–p3Energyplus eny–p4

Table des Matières