Connection Heat Pump; Starting Up - Elesta RTU200B Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Connection Heat pump

The diagrams provided are simplified for greater clarity.
The protective devices and other accessories required
by the standards are not illustrated. Standard UTE C15-
100 and good practice must be complied
with.Connected or nearby equipment must not generate
excessive interference (directive 2004/108/CE).
Heat
pump
Thermostat input
of the heat pump
The change-over input of the heat pump is not
controlled by the thermostat.

Starting up

Turn the knob to Shutdown and
press the right-hand button for
5 seconds until C100 x:xx is
displayed (maintenance menu
reserved for the installer).
Press OK.
The screen displays CF01.
R
C
1 2 3
5 sec.
- 24 -
CF01 - Correction of room temperature
measurement
If there is a difference between the temperature noted
(thermometer) and the temperature measured and dis-
played by the unit, the menu acts
on the measurement of the probe
so as to compensate for this diffe-
rence (from -4°C to +4°C in steps
of 0.1°C).
T
Press + or - to make your choice,
OK to confirm it and go to the
next menu.
CF02 - AUTO mode temperature display
option
Press + or - to make your choice,
OK to confirm it and go to the
next menu.
Temperature displayed
Continuous room temperature
display
Continuous display of the set-point
- 25 -

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières