Test Running After Installation - Qlima SC42 Série Manuel D'installation

Masquer les pouces Voir aussi pour SC42 Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 46
11. CHECK FOR COOLANT LEAKAGE
G
TAKE CARE
Evacuating the coolant piping and the interior unit of the air conditioner must be carried out
in accordance with the applicable national regulations. The test for coolant leakage of the
coolant piping and the interior unit may only be carried out by a certified fitter.
POSSIBILITIES FOR LEAK CHECK AIR CONDITIONER
Soap water method: Apply a soap water or a liquid neutral detergent on the indoor unit connection
or outdoor unit connections by a soft brush to check for leakage of the connecting points of the
piping. If bubbles come out, the pipes have leakage.
Dedicated special leak detector: Use the leak detector to check for leakage.

12. TEST RUNNING AFTER INSTALLATION

Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
Check if all the functions works well during test running. Especially check whether the drainage of indoor
unit is smooth or not.
4
88

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sc52 sérieScja 19 série

Table des Matières