Bringing The Device Into Operation; Setup; Preparation Of Your Pc - Medion AKOYA X55005 Mode D'emploi

Table des Matières

Publicité

Bringing the device into operation

Information
Please read the "Safety information" chapter on page 4 under all circumstances before
bringing the device into operation.

Setup

Attach the stand of the TFT monitor as illustrated. Carry out this step before connecting the monitor.
Take the TFT monitor down as shown in the drawing.

Preparation of your PC

You may have to make some preparations if you have been operating a tubed monitor on your computer up to
now. This will be necessary if your current monitor has been operated with settings that are not supported by
your new TFT screen.
The screen will represent up to 1920 x 1080 scanning elements. This resolution corresponds to the physical
resolution. TFT screens achieve complete image quality with the physical resolution. The display will not appear
on the whole area of the screen, under certain circumstances, if you change to a representation with deviating
settings.
Distortions can also appear in the representation, particularly in the case of lettering.
Set a resolution and image frequency on the PC supported by both monitors, using the old monitor, before you
connect the new monitor.
Shut down the PC and connect the new monitor.
You will be able to adjust the screen settings on the MD 20160 as described after restarting.
(Ill.: Installation of the monitor stand)
Taking down the base of the monitor (Ill. similar)
English
DE
EN
FR
ES
DK
NL
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Md 20160

Table des Matières