Bartscher K7EBM05VV Mode D'emploi page 23

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ƒ The Fire Brigade rules
INSTALLATION
Preliminary operations
Remove the appliance from the packaging, ascertaining that it is intact and, if in doubt, do not use it
but call in professionally qualified personnel. After having verified that the appliance is in good
condition, the protective film may be removed. Carefully clean the external parts of the appliance
with warm water and detergent using a cloth to remove all remaining residues and then dry it with a
soft cloth. If there are still traces of glue residues, remove them by using a suitable solvent (e.g.
acetone.
For no reason use abrasive substances. After having been put into place, the appliance
must be levelled by regulating the adjustable feet.
Electric connection
Before connecting the appliance, it is necessary to check that the voltage of the power supply
available corresponds to the voltage the appliance has been set for. In the event that they do not
correspond, it is necessary to modify the connection as shown in the electric diagram, if voltage
change is provided for. The junction boxes are situated behind the control panel of the top.
Furthermore, the efficiency of the earth connection must be checked, and also that the earth
conductor on the connecting side is longer than the other conductors, and that the connecting cable
has a wire bunch adequate for the power absorbed by the appliance and is at least type H05 RN-F.
As in international provisions, before installing the appliance a unipolar device must be
installed with a contact opening of at least 3mm which must not interrupt the YELLOW-
GREEN earth wire. The device must be installed near the appliance, it must be approved and have
adequate capacity for the absorption of the appliance (see technical features).
The appliance must be connected to the EQUIPOTENTIAL system. The connector is situated near
the end of the electric cable and is identified by a label with the symbol shown on fig.4 (pag.3)
ATTENTION! All the parts, protected and sealed by manufacturer may not be regulated by
the installer if not specifically indicated.
Water supply connection
Connect the water inlet piping to the distribution system following the provisions in force.
For the version "top" it is necessary to make the connection directly on the water filling tap (fig. 5 –
page 3). For this operation it is necessary to remove the handles, the lever of the draining tap and
the board. Pass the pipe through the slot (1) placed on the left bottom of the bain-marie and connect
it to the water filling valve (2). Use a flexible pipe that for rule has to resist to a temperature of 90
°C at least.
Pag. 22/40

Publicité

Table des Matières
loading

Table des Matières