Télécharger Imprimer la page

Install The Hood (Standard Installation) - Venmar VBLDN1 Manuel D'installation, D'utilisation Et D'entretien

Publicité

Les langues disponibles

Les langues disponibles

N
1 ] Run house power cable between service panel and hood location. For hood with power
2 ] Hang hood from two (2) rear mounting screws previously installed. Slide hood back towards
3 ] Secure the hood to the cabinet using two (2) no. 8 x 5/8" round head wood screws (included
4 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
20

Install the Hood (Standard Installation)

OTE:
Two installers are recommended because of the weight of this hood.
cable access located on back of hood, run the house power cable into the hood through
the strain relief previously installed in step 6 on page 11. For hood with power cable access
located on top, tighten the strain relief to the power cable before inserting the strain relief in
the knockout hole.
wall until mounting screw heads are engaged in narrow end of keyhole slots in top of hood.
Tighten screws securely and maintain a hold on the hood until completing step 3.
in parts bag). Insert one (1) screw per side, in the slots (as shown below). Attach power cable
to the hood using the strain relief.
Screw previously
tighten in step 2.
Make sure the damper assembly (or round duct plate) enters the ductwork and that the damper
opens and closes freely.
BACK OF HOOD
DUCTED INSTALLATION ONLY

Publicité

Chapitres

loading