Télécharger Imprimer la page

Install The Hood (Ez1 Bracket) - Venmar VBLDN1 Manuel D'installation, D'utilisation Et D'entretien

Publicité

Les langues disponibles

Les langues disponibles

N
OTE:
The following procedure applies to both frame or frameless cabinet installations.
1 ] Run house power cable between service panel and hood location.
2 ] There are 2 pairs of recessed holes on each side of the top of the hood (on rear: A and B,
on front C and D on illustration below); these holes allow the range hood to hang on the
brackets (previously installed).
HORIZONTAL EXHAUST INSTALLATION ONLY
3 ] Temporarily hang the hood on the brackets using its (2) recessed REAR HOLES (A and B).
While holding the hood, run the house power cable into the hood through the strain relief
previously installed in step 6 on page 11.
4 ] Unhook the rear holes from the brackets and hang the hood using its (2) recessed FRONT
HOLES (C and D). While holding the hood, go to step 6.
VERTICAL EXHAUST INSTALLATION AND NON-DUCTED INSTALLATION ONLY
5 ] Hang the hood on the brackets using the (2) recessed FRONT HOLES (C and D). While
holding the hood, tighten an appropriate strain relief, 1/2" diameter (not included) to the
power cable, then insert the strain relief in the knockout hole.
6 ] Connect ductwork to hood and use metal foil duct tape to make joints secure and air-tight.
Make sure the damper assembly (or round duct plate) enters the ductwork and that the
damper opens and closes freely.
NOTE: See final installation steps on next page.

Install the Hood (EZ1 Bracket)

A
C
A
DUCTED INSTALLATION ONLY
D
B
B
17

Publicité

Chapitres

loading