Flue Gas Fitting - Palazzetti Isabel 9 US Manuel D'installation, D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

If additional heating appliances and/
or extraction fans (extractor hoods) are
present and functioning in the instal-
lation room, combustion malfunctions
may occur due to insufficient combus-
tion air
The combustion air intakes must
therefore be sized correctly, in order to
ensure the necessary supply of air for
the correct operation of all devices.

6.5 Flue gas fitting

The appliance works with the combustion cham-
ber at negative pressure. It is therefore essential
to make sure that the flue gas evacuation is
airtight (this is the responsibility of the installer).
The appliance must be connected to its own flue
gas duct, not shared, and which is suitable for
ensuring adequate dispersion of the combustion
products into the atmosphere, in accordance
with the regulations in force in the country of
installation.
The components making up the flue
gas ducting system must be declared
suitable for the specific operating con-
ditions and provided with CE marking.
It is mandatory to create a first vertical
section measuring at least 1.5 meters to
guarantee correct expulsion of the flue
gases.
It is advisable to make a maximum of 3 direction
changes, in addition to that resulting from the
rear connection of the appliance to the chimney,
using 45 - 90 ° bends or Tee fittings (Fig. 17).
Always use a Tee fitting with inspection cap at
each horizontal and vertical change of the flue
gas route (Fig. 17).
The horizontal sections must have a maximum
length of 2-3 m with an upward slope of 3-5%
(Fig. 17).
Anchor the pipes with suitable collars to the wall.
The flue gas fitting MUST NOT BE connected:
• to a chimney used by other generators (boilers,
stoves, fireplaces, etc. ...);
• to air extraction systems (hoods, vents etc. ...)
even if "ducted".
It is forbidden to install shut-off and draught
valves.
64
B
As an additional safety measure, a threaded cou-
pling with "R" closing cap is provided in order to
connect a condensate drain pipe (Fig. 18).
R
B
Fig. 17
Fig. 18
004778680 - 25/02/2021

Publicité

Table des Matières
loading

Table des Matières