EXIT Toys Supreme Ground Level Mode D'emploi page 16

Masquer les pouces Voir aussi pour Supreme Ground Level:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

STEP 4
Place the mat (6) on the ground inside
the frame.
Make sure the back side of the mat is
facing up.
Caution: It is wise to wear leather
gloves while attaching the springs. Be
the Springs. Be careful where you
careful where you place your hands
as the springs and frame joints can
pinch.
1.
Hook one end of a spring into a
V-ring sewn on the jump mat.
2.
Hook a spring tool shown in the inset
drawing into the free end of the
wing into the free end of the
spring.
3.
Pull it by using the spring tool until it
reaches the frame.
4.
Push the end of the spring into a hole
in the frame. Unhook the spring tool.
4.1
Attach the V-ring sewn to the corner of
the mat to the tube welded to cor-ner
tube by a small spring as shown. You
will then have four small springs (7-B)
attached, one to each corner.
4.2
Count exactly 12 frame holes and 12
V-rings in the 14ft direction. Attach three
big springs (7-A). Repeat on the opposite
14ft long side of the tram-poline.
Count exactly 4 frame holes and 4 V-rings
in the 8ft direction. Attach three big
springs (7-A). Repeat on the opposite 8ft
short side of the trampoline. You should
now have 16 springs attached.
Continue to attach the remaining big
springs between the previously attached
springs, until all springs are attached.
Note:
As you attach springs, carefully count
the V-rings and frame holes. If a
V-ring or a hole is skipped, re-attach
the spring in the proper position.
Note: The spring has a large hook
that attaches to the frame and a
small hook that attaches to the mat
ring.
16
MTR-10105-V05
ame. Unhook the spring
y a small spring as shown.
ame holes and 12
4
7-B(1x)
the
7-A(3x)
7-B(1x)
e 16
Supreme
Trampolines
6
7
1 / 2-A / 2-B
2-A / 2-B
4
7-B
14Ft/427cm
7-A(3x)
7-B(1x)
7-A(3x)
7-B(1x)

Publicité

Table des Matières
loading

Table des Matières