Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
For the installation, you need one GKV 240V/600W G-9.5 lamp.
Procedure:
Step 1: Open the lampholder cover by loosening the fixation screw.
Step 2: If replacing the lamp, remove the old lamp from the spot.
Step 3: Insert the lamp in the lampholder.
Step 4: Insert the lampholder and close the device.
Overhead rigging
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
Do not operate this device with opened housing!
16/35
41600122_V_1_0.DOC