Télécharger Imprimer la page

Mounting The Work Piece; Step-By-Step Welding; Preparing For Welding; Securing The Pipe - AXXAIR SATO-40E41 Mode D'emploi

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 3
INNOVATIVE ORBITAL SOLUTIONS
8.

Mounting the work piece:

This operation requires aligning the electrode with the surfaces to be welded. This alignment must be
done accurately so that the weld can be made in the section of the joint plane.
9.

Step-by-step welding:

Preparing for welding:

Preparations for open arc welding are essential
to obtain a satisfactory weld. The cut must be
perpendicular to the axis. Refer to the CC-series
orbital cutting machine.
Depending on the quality required, the surface
may be prepared using a form working tool to
ensure that the section surface is perfectly
smooth and streak-free.

Securing the pipe:

To ensure proper geometric alignment, manually tack weld the work pieces
prior to welding using the weld head in tack weld mode.
Join
experience
0
SAS au capital de 135 720 € - RCS Romans B414 581 363 – Code APE 2841 Z – Siret 414 581 363 00028 – TVA FR13414 581 363
Aligning the electrode on the
section to be welded
330B Route de Portes Les Valence - ZI Les Bosses - 26800 Etoile sur Rhône
Tél: +33 475 575 070 - Fax: +33 475 575 080 - commerce@axxair.com - www.axxair.com
- 26 -
ENGLISH

Publicité

loading