Télécharger Imprimer la page

IKA-WERKE C 5030 Mode D'emploi page 7

Publicité

Les langues disponibles

Les langues disponibles

This symbol identifies information which is of absolu-
te importance for the safety of your health. Non-
compliance may lead to impairments to health and injury.
This symbol identifies information which is important for
proper operation and handling of the decomposition ves-
sel. Non-compliance may result in imprecise measure-
ments or damage to the venting station.
C
Explanation of symbols
Contens
Guarantee
Safety instructions
Unpacking
Delivery quantity
Setting up in the instrument
Function
Maintenance and cleaning
Fault table
Spare part list
Spare part diagram
You have purchased an original IKA laboratory machine which
meets the highest engineering and quality standards.
In accordance with IKA guarantee conditions, the guarantee peri-
od is 12 months. For claims under the guarantee please contact
your local dealer. You may also send the machine direct to our
C5030/7030 0399
works, enclosing the delivery invoice and giving reasons for the
claim. You will be liable for freight costs.
S
a
The C5030 venting station is used for controlled venting
of IKA decomposition vessels C5010, C5011 and C5012
in conjunction with the IKA C5000 control / duo control
calorimeter system in the "decomposition" operating mode.
The C7030 venting station is used for controlled venting
of IKA decomposition vessels C7010, C7011, C7012 and
AOD 1.1
Page
The venting speed may be infinitely adjusted via a throttle valve by
using a manual adjusting screw. Please note that the throttle valve
7
is closed at the beginning of the venting operation.
7
7
Do not operate without the ground clamp included in the deli-
7
very quantity!
7
The maximum permitted operating pressure is 40 bar.
8
Please observe the general laboratory guidelines when handling
8
glass vessels.
9
10
11
11
U
n
p
18/19
Please unpack the venting station carefully and check it for dama-
ge. It is important that any transport damage is detected when the
vessel is unpacked. If necessary, and inventory of the damage
should be made immediately (postal service, railway, houlage
company).
f
a
c
7

Publicité

loading

Ce manuel est également adapté pour:

C 7030