Mounting The Handles On Integrated Units - F.Bertazzoni REF30PIXL Notice D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Guide
Series: Integrated (BI)

Mounting the handles on Integrated units

1
Handles will have to be mounted on the panels before they are ap-
plied to the fridge. For overlay panel mounting, remove the screw
connecting the stand-offs to the handle bar. The overlay screw will
pass through the overlay panel, the stand-off and into the handle
bar.
Operate as follows:
Drill two holes of 5 mm (1/4 ") on the rear side panels, in-
sert the supplied screws to the distance indicated in the
the table below. To center the vertical handle (code HV) to
the center of the door, split into two the height of the panel and make
a hole at -450 mm (-17 3/4") and one at +450 mm (+17 3/4")
.
1
2
Place the handle on top of the holes and insert the screws through
the panel and into the handle support
.
2
490 mm
900 mm
480 mm
Distance between stand-offs X
(19 1/4")
(35 1/2")
(18 7/8")
15

Publicité

Chapitres

Table des Matières
loading

Table des Matières