Installation - Unox Pure Mode D'emploi

Masquer les pouces Voir aussi pour Pure:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation

Attention: before proceeding with the installation of the appliance, carefully read the technical
!
data sheet and the operation and safety indications.
In case the appliance is stored or transported at temperatures lower than 0 °C, leave the appliance
with original packaging at indicated environmental temperatures for at least 24 hours before setting
at work.
Installation of the fi lter head and the water pipes (Picture 1)
Attention: make sure the fi lter head locking handle is open.
!
Close the water fl ow and disconnect the distribution appliance from power supply.
A
In case the fi lter is required to be fi xed at wall, fi x the wall bearing (5) on the correct
B
position.
Attention: during the installation pay attention to the installation dimensions, pipes bend radius
!
and accessories dimensions. The system can work both in vertical and horizontal position but, in
case of wall installation, place the system only in vertical position!
By using the fi rst installation kit connect the issued fl exible pipes
C
and to the water outlet "OUT"
4
place in both the safety clips
Click the fi lter head
D
Filter insertion
Pull out the protective cap
E
Write down the following replacement date on the fi ltering cartridge date fi eld
insert the fi ltering cartridge
Attention: the fi ltring cartridge can be inserted only with the locking handle
!
the fi ltering cartridge is correctly placed.
Insert the fi lter head
F
the coupling sound.
Connection to the oven
1.
Disconnect the fl exible pipe
(pic. 2).
2.
Connetct one of the two fl exible pipes
"From UNOX.Pure" joint (pic. 3).
3.
Connect one of the two fl exible pipes
"To UNOX.Pure" joint (pic. 3).
of the fi lter head
3
.
11
on the wall bearing
1
.
7
in the fi lter head
6
inside the cartridge
1
from the oven "To UNOX.Pure" and "From UNOX.Pure" joints
1
to the fi lter head "OUT" joint
11
to the fi lter head "IN" joint
11
15
. Once the fl exible pipe is installed,
1
, if required.
5
.
1
and turn the locking handle
6
to the water inlet "IN"
11
. Vertically
6
open. Pay attention
2
until you hear
2
and to the oven
3
and to the oven
4
English

Publicité

Table des Matières
loading

Produits Connexes pour Unox Pure

Ce manuel est également adapté pour:

Xc215Xc216

Table des Matières