Gas Train; Gas Train Electricity Supply; Gas Feeding Line - Chappee TIGRA 2 CG510 Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.4 GAS TRAIN,

(as EN 676)
The gas train is supplied separately, for its adjustment see the enclosed instructions.
GAS TRAIN
TYPE
MBC 65 DLE
MBDLE 405 B01
MBC 65 DLE
MBDLE 405 B01
MBDLE 407 B01
MBDLE 407 B01
MBDLE 410 B01
MBDLE 412 B01
3.5

GAS TRAIN ELECTRICITY SUPPLY

The gas train's power cables can be fed to the right or
left of the burner, as illustrated in figure 6.
Depending on the entry point, the cable clamp with
pressure test point (1) and simple cable clamp (2) may
need swapping over.
Consequently, you must make sure:
the cable clamp (1) is positioned correctly;
the tube is positioned correctly so that there are no
restrictions likely to impede air flowing to the pres-
sure switch.
WARNING
If necessary, cut the tube to the right size.

3.6 GAS FEEDING LINE

1
– Gas supply pipe
2
– Manual cock (charged to the installer)
3
– Gas pressure gauge (charged to the installer)
4
– Filter
5
– Gas pressure switch
6
– Safety valve
7
– Pressure governor
8
– Adjusting valve
M1 – Gas-supply pressure test point
M2 – Pressure coupling test point
MATCHED BURNER
TIGRA 2 CG510
TIGRA 2 CG710
TIGRA 2 CG1210 1A
TIGRA 2 CG1810 1A
1
2
CONNECTIONS
INLET
OUTLET
Rp 1 / 2
Flange 1
Rp 1 / 2
Flange 1
Rp 1 / 2
Flange 2
Rp 3 / 4
Flange 2
Rp 3 / 4
Flange 2
Rp 3 / 4
Flange 3
Rp 1 1 / 4
Flange 3
Rp 1 1 / 4
Flange 3
1
2
3
M1
4
5
D5209
MBC 65 DLE
6
7
GB
USE
Natural gas and LPG
Natural gas and LPG
Natural gas ≤ 70kW and LPG
Natural gas and LPG
Natural gas and LPG
Natural gas ≤ 150kW and LPG
Natural gas and LPG
Natural gas
D7113
6
7
8
8
7
D7279
Fig. 6
2
1
Fig. 7
M2
20016967

Publicité

Table des Matières
loading

Table des Matières