B.A. International Powersurge PS3X Notice D'instruction page 12

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
VI - HYGIENE AND MAINTENANCE
-----------------------------------------------------------------------------------------------
Sterilisation of medical devices must be done by properly trained and
E
protected staff, in compliance with current regulations. The sterilisation
protocol must be appropriate to the infectious risk.
Wear appropriate protective clothing: risk of infection and injury.
Only use products for the maintenance of medico-surgical equipment
compatible with stainless steel (no chlorinated content).
Forbid antiseptics that are intended for use on skin and mucous.
Forbid products containing aldehyde, alcohol or other products likely to
bind proteins.
For each product used: refer to the manufacturer's instructions.
D
Comply with the concentrations, exposure durations, and life span of
products. Do not mix the products and follow the instructions for their
disposal.
12
VI.1 - Preparation of MD in the place of use
To be done immediately after surgery (maximum time of 2 hrs):
• Disconnect the MD from the motor,
• Remove the rotary tool (see § V.6),
• Remove the largest organic contaminants with disinfectant wipes.
VI.2 - Preparation for sterilisation
Disassembly of MD:
• Remove the rotary instrument,
• Disconnect the MD from the motor,
• Remove the rotary instrument and the spraying nozzle.
Contra-angle (Fig 1):
• Pivot the F lever up to the stop (indifferently towards the right or
towards the left),
• Pull the A head,
• Remove the collar cartridge D.
Handpiece (Fig 1)
• Bring the p mark aligned with X mark,
• Remove the front I part, then the J axle by pulling axially.

Publicité

Table des Matières
loading

Table des Matières