EST RUN AND FINAL CHECK
The installer is obliged to verify correct operation of the indoor and
outdoor unit after installation.

Final check

Before switching on the unit, read following recommendations:
When the complete installation and all necessary settings have
been carried out, close all front panels of the unit and refit the
indoor unit cover.
The service panel of the switch box may only be opened by a
licensed electrician for maintenance purposes.

Automatic test run

When the unit is put into operation (by pressing the
the first time, the system will automatically perform a test run in
cooling mode. The test run will take up to 3 minutes, during which no
specific indication is given on the user interface.
During the automatic test run, it is important to ensure that the water
temperature does not drop below 50°F (10°C), which might activate
the freeze-up protection and thereby prevent the test run to finish.
Should the water temperature drop below 50°F (10°C), press the
h/c button so the h icon is displayed. This will activate the backup
heater during the automatic test run and raise the water temperature
sufficiently.
If the automatic test run has ended successfully, the system will
automatically resume normal operation.
If there are misconnections or malfunctions, an error code will be
displayed on the user interface. To resolve the error codes, see "Error
codes" on page 41.
NOTE
When the outdoor unit is put into pump down operation
(see the outdoor unit installation manual), the
automatic test run flag will be cleared. The next time
the system is put into operation, the automatic test run
will be executed again.
After finishing automatic test run or power ON/OFF, the
compressor will operate in the selected operation
mode and continue for certain time (set point on the
remote controller is overruled during this operation).

Test run operation (manual)

If required, the installer can perform a manual test run operation at
any time to check correct operation of cooling, heating and domestic
water heating.
Procedure
1
Push the z button 4 times so the t icon will be displayed.
2
Depending on the indoor unit model, heating operation, cooling
operation or both must be tested as follows (when no action is
performed, the user interface will return to normal mode after 10
seconds or by pressing the z button once):
To test the heating operation push the h/c button so the h
icon is displayed. To start the test run operation press the
y button.
To test the cooling operation push the h/c button so the c
icon is displayed. To start the test run operation press the
y button.
To test the domestic water heating operation push the v
button. The test run operation will start without pressing the
y button.
Installation manual
38
3
The test run operation will end automatically after 30 minutes or
when reaching the set temperature. The test run operation can
be stopped manually by pressing the z button once. If there are
misconnections or malfunctions, an error code will be displayed
on the user interface. Otherwise, the user interface will return to
normal operation.
4
To resolve the error codes, see "Error codes" on page 41.
To display the last resolved error code, push the z button
1 time. Push the z button again 4 times to return to
normal mode.
NOTE
y
button) for
M
AINTENANCE AND SERVICE
In order to ensure optimal availability of the unit, a number of checks
and inspections on the unit and the field wiring have to be carried out
at regular intervals.
This maintenance should be carried out by your local technician.
To execute the maintenance activities as mentioned below, it is only
required to remove the indoor unit cover. See "Opening the indoor
unit" on page 9.
Maintenance activities
DANGER: ELECTRIC SHOCK
Play it safe!
Touch a metal part by hand (such as the stop valve) in
order to eliminate static electricity and to protect the PCB
before performing service.
DANGER
Do not touch water pipes during and immediately after
operation as the pipes may be hot. Your hand may suffer
burns. To avoid injury, give the piping time to return to
normal temperature or be sure to wear proper gloves.
It is not possible to perform a test run if a forced
operation from the outdoor unit is in progress. Should
forced operation be started during a test run, the test
run will be aborted.
Before carrying out any maintenance or repair activity,
always switch off the circuit breaker on the supply
panel, remove the fuses (or switch off the circuit
breakers) or open protection devices of the unit.
Make sure that before starting any maintenance or
repair activity, also the power supply to the outdoor
unit is switched off.
Do not touch live parts for 10 minutes after the power
supply is turned off because of high voltage risk.
The heater of the compressor may operate even in
stop mode.
Please note that some sections of the electric
component box are hot.
Make sure you do not touch a conductive section.
Do not rinse the indoor unit. This may cause electric
shocks or fire.
When service panels are removed, live parts can be
easily touched by accident.
Never leave the unit unattended during installation or
servicing when service panel is removed.
Indoor unit for air to water heat pump system
EKHBH/X054BA
4PW54216-1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ekhbx054baEkhbh030baEkhbx030ba

Table des Matières