Installation And Start-Up; Applications - Salicru SPS NET Manuel D'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16

5. INSTALLATION AND START-UP.

Inspect the device before proceeding with the installa-
tion. Confirm that no item is damaged.
Placement.
The SPS NET can be used free-standing or hung on the wall
using the rear screw slots provided for this purpose, as
shown in the figure below:
Connecting the device to the mains to charge it.
Plug the AC mains lead (
NET will turn on automatically and the green LED will light.
If the battery is not completely charged, the green LED will
blink while the SPS NET charges it.
For best results, charge the battery for at least 4 hours
before first use or after no use for more than two
months. Otherwise, the reaction of the SPS.NET may be unsat-
isfactory in the event of a power grid outage during the first
hours of work, due to the fact that its response capacity during
unforeseen AC grid failures is dependent on accumulated en-
ergy in the battery.
Connecting the loads.
Connect the output connector of the SPS NET (
loads. The connected loads will now be protected by the
SPS NET.
MANUAL DE USUARIO
) into a main socket. The SPS
) to the
Operation of the On/Off button
Starting up the SPS NET when connected to the mains:
ˆ
press and hold the button for 3 seconds.
Resetting the SPS NET in fault mode: press the button
ˆ
for 10 seconds and then release it.
Turning off the SPS NET in Battery mode: press and
ˆ
hold the button for 6 seconds to turn off the SPS NET
and prevent a deep discharge of the battery.
Starting up and turning off the SPS NET in online mode:
ˆ
Press and hold the button for 6 seconds to turn off
the SPS NET while maintaining the battery charge.
Press and hold the button for 3 seconds to start the
SPS NET while maintaining the battery charge.
Checking the battery capacity: With the equipment
ˆ
powered and off, press the On / Off button for 0.5
seconds, the LEDs will light up to show the battery ca-
pacity.
LED indicators.
R
FAULT
25%
50%
75% 100%
Operating state
SPS NET ON with battery completely
charged.
SPS NET has detected a fault.
These 4 indicators also indicate the battery charge level
during charging and discharge.
Battery
Battery in
Charging battery with
capacity
discharge
0% ~ 25%
26% ~ 50%
51% ~ 75%
76% ~ 90%
76% ~ 100%
91% ~ 100%
:
LED lit.
:
LED flashing.
Table 1. Meaning of the LEDs.
During the charging process, the sequence of LEDs os-
cillates, because each indicator covers an important
range of % charge.

6. APPLICATIONS.

The SPS NET has been designed to provide emergency backup
power for any system powered by a DC voltage, such as routers,
modems, VoIP telephone systems, surveillance systems, alarms,
access controls and critical telecommunications equipment.
SPS.NET SISTEMAS DE ALIMENTACION ININTERRUMPIDA (SAI)
.
The first LED is bi-colour (green
and red) and indicates the
operating state. The remaining
3 LEDs are green.
Colour
On / Flashing
Green
On
Red
On
activated output
13

Publicité

Table des Matières
loading

Table des Matières