4.2 Principle diagram:

Article no. Identification
1
Base plate
2
Service lid – Entrance
3
HT – Tube DN 150
4
Delivery hose DN50
5
Gear motor 220V, 370 watt icluding rack
6
Wiring of the motor connection
7
Connection for drainage of remaining water DN25
8
Hose clamps
9
Storz A – clutches 4 inch for filling of the tank
Both of the Storz A – clutches (9) are for the filling of the tank using a lorry.
Through the generous service lid (2) the underground tank is accessible, also inside, even in a filled
condition..
4.3 Installation delivery- and air-return hose
Attach – tube DN150 (3) conus konus am Domschacht aufstecken und in der Erde in Richtung Heizung
verlegen.
Insert the delivery hoses DN50 (4) and the wiring fort he motor connection (6) afterwards.
Attention:
The maximum of the complete length into one direction and the maximum height from the bottom of
the underground tank up tho the pellet boiler may not exceed the quoted length and height!
Attention should be paid to the planning documents of the boiler manufacturer, which must be
followed.
The minimum bending radius of the hoses averages 50cm.
The hoses must be laid as straight as possible and not in loops („up and down"), otherwise problems
might occur at the pellets delivery.
Delivery- and air-return hoses must always be in one piece and may not be dismembered!
Pellets hose
heating
Air hose
V00070130
Figure 11: Principle diagram
Amount per
In the scope of
container
delivery included
1
1
--
--
1
--
1
2
2
yes
yes
no
no
yes
no
yes
no
yes
45

Publicité

Chapitres

Table des Matières
loading

Table des Matières