Free Room; Installation - Zanotti DBO Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.4 Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.

6.5 Installation

Place the condensing unit on the floor.
Install the evaporator as follows:
A)
Drill the holes in the ceiling keeping the necessary distance from the wall 140 cm.
A
B)
Please select the matching cable length for sensor cables and power cables between the evaporating unit
and the condensing unit. (The length must be equal to the length of the pre-charged pipe for the models SPO/GS
and standard length of 10 meters for the models DBO/DBS up to the model 135).
C)
Fit a drain line to the condensate water drain connection in the lower part of the evaporator.
Mod.
DBO 140
540
DBO 235
540
DBO 335
DBO 340
B
A
B
605
965
540
1370
540
1520
C
Mod
DBO 121
DBO 221
DBO 135
260
B
C
260
663
260
1083
250
1663
n°4
Ø 12
A
25

Publicité

Chapitres

Table des Matières
loading

Table des Matières