Technical Data - GESTRA DK 47L Instructions De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20

Technical Data

Pressure/Temperature Ratings
PMO
[bar]
TMA
[°C]
Admissible back pressure: up to 80 % of upstream pressure
Installation
1. Installation in any position, preferably in horizontal lines with cap on top.
2. Observe direction of flow. The flow direction arrow is on the trap body.
3. Leave at least 30 mm free space X around the equipment for removing the cap
(DK 47, DK 57) and/or the sealing plug F (DK 47) at a later date.
4. Install trap.
42
PMO
400
TMA
[PSI]
609
[°F]
752
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dk 47hDk 57lDk 57h

Table des Matières