Installation Information - DURAVIT Happy D.2 760320 Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
Important information
regarding the mounting instructions
These mounting instructions come as part of the Duravit
bathtub and should be read carefully prior to installation.
Explanation of the pictograms and symbols
DANGEr!
At high risk of fatal hazards or
serious injuries
ADVICE!
In the case of potential damage to property
Link to the Electrical Installation section
Link to installation information in this section
Inspection (e.g. for scratches)
Indication of the length of time (e.g. 10 minutes)
Inspect to check for leaks and tightness
Indication of the temperature
Unit 1
Unit 2 (only with Combi systems)
Control unit
(Number depends on the whirl system)
Intake opening
Inspection hatches required
Target group and qualification
The whirltub must only be installed by trained plumbing
engineers. The electrical installation may only be carried
out by qualified electricians.
NoTE! Local installation regulations and any country-
specific standards must be observed at all times.
6
WH_M_Einbau_Fliesen_Oval/15.12.3
Safety information
DANGEr! risk of fatal electric shock.
> Do NOT remove any whirltub components.

Installation information

Please read pre-installation datasheets prior to the
installation. These are available to download on the
Internet at www.duravit.com.
Seitenansicht
NoTE!
Lateral view
If the tray has a base inlet, a pipe interrupt must always
be installed on-site.
> See installation diagram.
Checking the whirl system (Diagram 10)
10
> Switch on the whirl system for 10 minutes: run
this through once completely in the case of
circuits with different levels of intensity.
Technische Verbesserungen und optische VerŠnderungen an den abgebildeten Produkten behalten wir uns vor.
We reserve the right to make technical improvements and enhance the appearance of the products shown.
> Leave the water in the bathtub and wait 10 minutes.
Datum
Name
Ma§stab
Artikel-Nr.
Date
Scale
Model-No.
Gezeichnet
> Check to make sure that it is leak-tight.
Name
08.10.13
Allgaier
1:20
Drafted
GeprŸft
Bezeichnung
08.10.13
WLT
1:10
X
Certified
> If adjustments are required, repeat the check.
Description
GeŠndert
1:5
Modified
Providing for an inspection hatch (Diagram 11)
11
Install the whirltub such that all vital assemblies
(pump, air blower and controls) remain accessible
> Providing for inspection hatches
• Area: see page 64
• Dimensions of the inspection hatches
for assemblies: min. 50 x 50 cm
for drain fittings: min. 20 x 20 cm
• Sealed to avoid spray water
• Only to be opened with a tool
Providing for an air supply (Diagram 12)
12
> Provide for an opening on the panel with an area
of approx.15 cm
(e.g. 3 x 5 cm or 2 x 7.5 cm) for
2
the air supply.
Zeichnung
000000 - 00 - 0
000000
# W-T-
Drawing
Schematische Zeichnung mit Rohrunterbrecher
Spezial Ab-und †berlaufgarnitur mit Bodenzulauf
fŸr Badewanne
Special waste and overflow with base inlet
for bathtubs

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Puravida 760184Starck 760009Starck 760011Starck 700009

Table des Matières