K2 Pumps WPS05002K Notice D'utilisation page 32

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Standard Tank(CONVENTIONAL TYPE) Connection
From step 1 to 3 is the same as Pre-Charge Tank Connection from step 1-3 .
Step 5 is the same as Pre-Charge Tank Connection step 6.
PUMP ELECTRICAL CONNECTIONS
WARNING: It is recommended all electrical work be performed by a licensed electrician.
WARNING: When wiring from the power source to the pressure switch, it is recommended that you use either a 14-
gauge or 12-gauge cord.
WARNING: Before wiring the pressure switch, turn off the power source to which you are connecting to avoid
potentially life threatening electrical shock.
12
4. Cement 3/4in.PVC rigid Pipe into 3/4in. PVC 90-Degress
S×S Elbow. Cement 3/4in. PVC MPT×S Male Adapter into
3/4in.PVC rigid Pipe that connect with a 3/4in. PVC FPT×FPT
Union .(Fig. 4)
6. Completed installation with piping and tank is shown
(Fig. 6)
7. Install a tee, the reducing bushings and the barbed
fitting in the suction line. (Please see page 9~10), well
to pump connection for standard tank connection).
Install the AVC tube between the barbed fitting and the
port on AVC (which is mounted on the tank)
For Professional Technical Support call 1-844-242-2475

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wps07502k

Table des Matières