II – Generator operation:
In the event of failure of the electrical distribution system, the installation can be supplied with
power by a generator. During generator operation, the capacitor bank must disconnect itself
automatically.
It is connected as follows:
Make sure you keep the jumper for maintenance operations so you can short-circuit
the G/E auxiliary terminals. Extra jumpers can be obtained quoting Cat. No. 037508
from the Legrand catalogue.
(1)
See the section on connecting the auxiliaries on page 38.
_____________________________________________________________________________________________________
For this to happen, the generator needs to be connected to the terminal
block for the auxiliaries
Terminals G & E are short-circuited by a jumper which needs to be removed
prior to connection.
Connect an NC contact to the terminals in order for the generator to work.
When the generator starts,
automatically.
If work or maintenance is being carried out on the generator, repeat these
steps in reverse order.
(1)
.
the capacitor bank will be disconnected
41