Maintenance - Komfovent Domekt RECU-300VE-B-EC-C Manuel D'installation Et Maintenance

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
EN
Final Inspection
After installation of the unit, a thorough inspection should be carried out. This should include inspecting the inside
of the unit and removing debris and tools, which may have been left behind by on site contractors. Replace any
panels, which may have been removed and close all access doors, ensuring that the door sealing gaskets have
not been damaged.

MAINTENANCE

Before performing any inspection work, check whether the unit is switched
off from the electric power supply.
It is recommended to carry out routine maintenance of the air handling unit KOMFOVENT DOMEKT
RECU 300/450VE(W)-B-AC/EC – 4 times per year. Extracting unit elements (see 9 Picture). Cables must be
disconnected when extracting automation box, plate heat exchanger, fans.
22
A condensate pipe and a drain trap
view 1
UAB AMALVA we reserve the right to make changes without prior notice
D*
8 a Picture
9 Picture

Publicité

Table des Matières
loading

Table des Matières