Water Connection; Preliminary Check - Sanremo Milano LX SAP Livret D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

ENGLISH
1) Only cold water must be supplied to the appliances.
2) If the mains water pressure exceeds 6 bar, a pressure reducer must be installed to regulate the
outlet pressure to a maximum of 6 bar.
3) Connect the drain hose to the tray, avoiding sharp bends and keeping a sufficient slope for
regular flow of the drain water.
4) Connect the 3/8" hose to the mains outlet and then to the water softener and to the appliance.
N.B. A water softener is indispensable for correct appliance operation, best coffee in the cup
and long life of the components, since it removes scale and residues from the water that would
otherwise shorten their life.
The company is relieved of all and any liability in the event of failure to comply with
the above instructions.
Before using the appliance, check that:
- the plug is inserted properly into the mains power outlet;
- the filling hose is correctly connected to the mains outlet and that the water supply is open. Also
check for leaks;
- the drain hose is positioned according to the above instructions and fixed by a hose clamp.
With the steam tap (B) open, put the on/off switch (D) to position 1 and wait for the water in the boiler
to reach the maximum level set by the electronic control, which can be visually checked on the
level indicator (L). If the boiler does not fill within the set time-out (90 sec.), the pump stops and the
indicator lights on the control panel start to blink. If this happens, put the on/off switch (D) to position
0 and then to position 1 per to complete filling of the boiler.
Than put the on/off switch (D) to position 2, which switches on the electric heating elements to start
heating the water.
Wait for steam to come out the steam nozzle (B), then close the tap and, using the Boiler pressure
gauge, check that the pressure has reached and maintains a value of 0.8:1 bar. If it is not on this
value, turn the adjusting screw on the pressure switch (+increase, - decrease, see figure below).
N.B. Manual filling
Even if the control unit fails to operate, the appliance boiler (A) may be filled manually.
With the visual help of the level indicator (L), keep the manual filling knob (A) pressed until the water
fills the boiler, taking care not to exceed the maximum indicator level (L); then release the knob. In
this circumstance, use the manual switch (R) to dispense coffee.

Water connection

USE

Preliminary check

Pressure switch parts:
1 - Ring
2 – Membrane unit
3 – Teflon membrane
4 - Nut
5 – Disk with pipe tap
6 - Grommet
7 - Screw
18

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Milano lx sed

Table des Matières