Electrical Connection; Cable Feed - Olsberg 14/512-3 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Electrical Connection

Cable Feed

Fig.4
28
The storage heater is connected to element feed
(OFF-PEAK Tariff) and control cables for the room
thermostat and the charge control (A1/Z1; A2/Z2).
You will find the number and type of storage brick
packs in the section "Technical Data" The heater is
suitable for a direct cable feed, it is also suitable for
feeding from a spur junction.
Use at least a heat-resistant PVC cable (H05V2V2-F)
as a load current conductor.
According to regulations every branch circuit must be
individually protected, for instance by circuit breakers
for all phases. These circuit breakers must have con-
tact openings of at least 3mm.
Each storage heater must be connected to its own
separate load-current cable from the distributor panel.
Running cables from heater to heater is not allowed.
According to Utility Regulations, a single-phase con-
nection is only allowed for a heater rating of up to 2
kW. To do this, bridge the terminals L1-L2- and L3.
To connect to a Central Charge Control with "single-
wire control", bridge terminals A2/Z2 and N
Make sure the earth cable is firmly connected.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

14/513-314/514-314/515-314/516-314/517-3

Table des Matières