Installing the cooling unit

!
WARNING!
The installation may only be performed by a qualified technician.
7.1

Tools required

For installation and assembly, you will need the following tools:
• Drill
• Screwdriver
• Open-ended spanner: 16 mm, 19 mm and 21 mm
• Sealant and PUR foam
• Cable, cable lugs and cable clips
• Ester oil
7.2
Notes on the cooling container
Permitted cooling area contents
Make sure that maximum cooling area contents specified are not exceeded for the
respective vaporiser type (see chapter "Technical data" on page 32).
Minimum insulation
The maximum cooling area contents are based on a minimum insulation thickness of
35 mm of foam polyurethane with a density of 40 kg/m³. If other insulating materials
are used such as styrofoam, double the wall thickness to attain the same level of heat
insulation.
Installing the vaporiser
The vaporiser must be installed in the cooling container (except CS-NC15, the
vaporiser is premounted).
Observe the following in the process:
• Correct installation position (fig. 3, page 4 up to fig. 9, page 6)
• Arrangement in the cooling container as far to the top as possible
• Install a least 10 mm from the wall (not VD-14N and VD-15).